Cut subcontractor bid review from weeks to minutes

Nivel handles the manual bid work, so estimators can focus on decisions—not spreadsheets.

Cut subcontractor bid review from weeks to minutes

Nivel handles the manual bid work, so estimators can focus on decisions—not spreadsheets.

BUILT FOR THE WAY PRECONSTRUCTION WORKS.

"Estimators carry the most critical decisions in preconstruction. Hundreds of bids, buried exclusions, scope gaps. They deserve better tools than a highlighter and a spreadsheet."

Madhumitha SD

Ceo & Co-founder

nivel

Madhumitha SD

Ceo & Co-founder

nivel

99% of GCs still level bids manually in spreadsheets

0%

99% of GCs still level bids manually in spreadsheets

0%

99% of GCs still level bids manually in spreadsheets

0%

100s of hours spent per project on bid review

0+

100s of hours spent per project on bid review

0+

100s of hours spent per project on bid review

0+

10% of contract value lost to scope gaps & change orders on average

0%

10% of contract value lost to scope gaps & change orders on average

0%

10% of contract value lost to scope gaps & change orders on average

0%

Everything your preconsturction team needs for bid leveling— from invite to award

Nivel takes the manual work out of bid review -- no spreadsheets, no hunting through PDFs, no missed scope. Capture bids, level trades, and catch every gap in one place -- so your team can move faster and award with confidence.

Bid Capture, Any Format

Automatic Scope Leveling

Gap and Exclusion Flagging

  • Drag & drop files, or browse

    PDF, ZIP, and DWG

    Status

    Upload

    Redwood Heights Mixed Use Project Plans.pdf

    Upload

    Architectural Floor Plans Level 1 to 5.pdf

    Upload

    Structural Steel and Foundation Details.pdf

    Upload

    Mechanical Electrical Plumbing Specifications.docx

    Upload

    Bid Schedule and Cost Breakdown.xlsx

    Project Documents

    FILENAME

    PAGES

    SIZE

    STATUS

    UPLOADED

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    Drag & drop files, or browse

    PDF, ZIP, and DWG

    Status

    Upload

    Redwood Heights Mixed Use Project Plans.pdf

    Upload

    Architectural Floor Plans Level 1 to 5.pdf

    Upload

    Structural Steel and Foundation Details.pdf

    Upload

    Mechanical Electrical Plumbing Specifications.docx

    Upload

    Bid Schedule and Cost Breakdown.xlsx

    Project Documents

    FILENAME

    PAGES

    SIZE

    STATUS

    UPLOADED

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    Drag & drop files, or browse

    PDF, ZIP, and DWG

    Status

    Upload

    Redwood Heights Mixed Use Project Plans.pdf

    Upload

    Architectural Floor Plans Level 1 to 5.pdf

    Upload

    Structural Steel and Foundation Details.pdf

    Upload

    Mechanical Electrical Plumbing Specifications.docx

    Upload

    Bid Schedule and Cost Breakdown.xlsx

    Project Documents

    FILENAME

    PAGES

    SIZE

    STATUS

    UPLOADED

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    20 pages

    File.pdf

    147 MB

    Ready

    Mar 25, 2026

    Drop in bids exactly as you receive them -- PDFs, Excel, emails, even handwritten notes. No reformatting, no prep work required.

  • Electrical

    Plumbing

    HVAC

    Mechanical

    Concrete

    Framing

    Drywall

    Painting

    Flooring

    Roofing

    Masonry

    Scope Item

    VoltEdge Electrics

    Apex Power Systems

    BlueLine Electrical Services

    Lighting Fixtures &

    Installation

    1

    Included

    $42,000

    Source

    Included

    $39,500

    Source

    Included

    $36,000

    Source

    Emergency & Exit

    Lighting

    1

    Included

    $8,200

    Source

    Not mentioned

    Source

    Included

    $7,800

    Source

    Electrical Panels &

    Distribution

    1

    Included

    $28,000

    Source

    Included

    $25,500

    Source

    Included

    $26,200

    Source

    Fire Alarm System

    (by EC)

    1

    Excluded

    Source

    Included

    $14,000

    Source

    Hidden Exclusion

    Source

    Low Voltage Rough-In

    1

    Included

    $9,500

    Source

    Excluded

    Source

    Included

    $8,900

    Source

    Temporary Power &

    Construction Power

    1

    Included

    $6,000

    Source

    Alternate

    $4,500

    Source

    Not mentioned

    Source

    Device Installation

    (Outlets, Switches)

    1

    Included

    $18,000

    Source

    Included

    $16,800

    Source

    Included

    $17,200

    Source

    Conduit & Wiring

    1

    Included

    $52,000

    Source

    Included

    $48,000

    Source

    Included

    $49,500

    Source

    Total

    $163,700

    $143,800

    $109,600

    Electrical

    Plumbing

    HVAC

    Mechanical

    Concrete

    Framing

    Drywall

    Painting

    Flooring

    Roofing

    Masonry

    Scope Item

    VoltEdge Electrics

    Apex Power Systems

    BlueLine Electrical Services

    Lighting Fixtures &

    Installation

    1

    Included

    $42,000

    Source

    Included

    $39,500

    Source

    Included

    $36,000

    Source

    Emergency & Exit

    Lighting

    1

    Included

    $8,200

    Source

    Not mentioned

    Source

    Included

    $7,800

    Source

    Electrical Panels &

    Distribution

    1

    Included

    $28,000

    Source

    Included

    $25,500

    Source

    Included

    $26,200

    Source

    Fire Alarm System

    (by EC)

    1

    Excluded

    Source

    Included

    $14,000

    Source

    Hidden Exclusion

    Source

    Low Voltage Rough-In

    1

    Included

    $9,500

    Source

    Excluded

    Source

    Included

    $8,900

    Source

    Temporary Power &

    Construction Power

    1

    Included

    $6,000

    Source

    Alternate

    $4,500

    Source

    Not mentioned

    Source

    Device Installation

    (Outlets, Switches)

    1

    Included

    $18,000

    Source

    Included

    $16,800

    Source

    Included

    $17,200

    Source

    Conduit & Wiring

    1

    Included

    $52,000

    Source

    Included

    $48,000

    Source

    Included

    $49,500

    Source

    Total

    $163,700

    $143,800

    $109,600

    Electrical

    Plumbing

    HVAC

    Mechanical

    Concrete

    Framing

    Drywall

    Painting

    Flooring

    Roofing

    Masonry

    Scope Item

    VoltEdge Electrics

    Apex Power Systems

    BlueLine Electrical…

    Lighting Fixtures &

    Installation

    1

    Included

    $42,000

    Source

    Included

    $39,500

    Source

    Included

    $36,000

    Source

    Emergency & Exit

    Lighting

    1

    Included

    $8,200

    Source

    Not mentioned

    Source

    Included

    $7,800

    Source

    Electrical Panels &

    Distribution

    1

    Included

    $28,000

    Source

    Included

    $25,500

    Source

    Included

    $26,200

    Source

    Fire Alarm System

    (by EC)

    1

    Excluded

    Source

    Included

    $14,000

    Source

    Hidden Exclusion

    Source

    Low Voltage Rough-In

    1

    Included

    $9,500

    Source

    Excluded

    Source

    Included

    $8,900

    Source

    Temporary Power &

    Construction Power

    1

    Included

    $6,000

    Source

    Alternate

    $4,500

    Source

    Not mentioned

    Source

    Device Installation

    (Outlets, Switches)

    1

    Included

    $18,000

    Source

    Included

    $16,800

    Source

    Included

    $17,200

    Source

    Conduit & Wiring

    1

    Included

    $52,000

    Source

    Included

    $48,000

    Source

    Included

    $49,500

    Source

    Total

    $163,700

    $143,800

    $109,600

    Nivel structures every bid into a consistent view, trade by trade, so your team is comparing scope -- not trying to decode four different formats.

  • Evidence

    Page 1

    Fire Alarm (devices, wiring, programming) → Div. 28

    Electrical

    Plumbing

    HVAC

    Mechanical

    Concrete

    Framing

    Drywall

    Painting

    Flooring

    Roofing

    Masonry

    Scope Item

    VoltEdge Electrics

    Apex Power Systems

    BlueLine Electrical Services

    Lighting Fixtures &

    Installation

    1

    Included

    $42,000

    Source

    Included

    $39,500

    Source

    Included

    $36,000

    Source

    Emergency & Exit

    Lighting

    1

    Included

    $8,200

    Source

    Not mentioned

    Source

    Included

    $7,800

    Source

    Electrical Panels &

    Distribution

    1

    Included

    $28,000

    Source

    Included

    $25,500

    Source

    Included

    $26,200

    Source

    Fire Alarm System

    (by EC)

    1

    Excluded

    Source

    Included

    $14,000

    Source

    Hidden Exclusion

    Source

    Low Voltage Rough-In

    1

    Included

    $9,500

    Source

    Excluded

    Source

    Included

    $8,900

    Source

    Temporary Power &

    Construction Power

    1

    Included

    $6,000

    Source

    Alternate

    $4,500

    Source

    Not mentioned

    Source

    Device Installation

    (Outlets, Switches)

    1

    Included

    $18,000

    Source

    Included

    $16,800

    Source

    Included

    $17,200

    Source

    Conduit & Wiring

    1

    Included

    $52,000

    Source

    Included

    $48,000

    Source

    Included

    $49,500

    Source

    Total

    $163,700

    $143,800

    $109,600

    Evidence

    Page 1

    Fire Alarm (devices, wiring, programming) → Div. 28

    Electrical

    Plumbing

    HVAC

    Mechanical

    Concrete

    Framing

    Drywall

    Painting

    Flooring

    Roofing

    Masonry

    Scope Item

    VoltEdge Electrics

    Apex Power Systems

    BlueLine Electrical…

    Lighting Fixtures &

    Installation

    1

    Included

    $42,000

    Source

    Included

    $39,500

    Source

    Included

    $36,000

    Source

    Emergency & Exit

    Lighting

    1

    Included

    $8,200

    Source

    Not mentioned

    Source

    Included

    $7,800

    Source

    Electrical Panels &

    Distribution

    1

    Included

    $28,000

    Source

    Included

    $25,500

    Source

    Included

    $26,200

    Source

    Fire Alarm System

    (by EC)

    1

    Excluded

    Source

    Included

    $14,000

    Source

    Hidden Exclusion

    Source

    Low Voltage Rough-In

    1

    Included

    $9,500

    Source

    Excluded

    Source

    Included

    $8,900

    Source

    Temporary Power &

    Construction Power

    1

    Included

    $6,000

    Source

    Alternate

    $4,500

    Source

    Not mentioned

    Source

    Device Installation

    (Outlets, Switches)

    1

    Included

    $18,000

    Source

    Included

    $16,800

    Source

    Included

    $17,200

    Source

    Conduit & Wiring

    1

    Included

    $52,000

    Source

    Included

    $48,000

    Source

    Included

    $49,500

    Source

    Total

    $163,700

    $143,800

    $109,600

    Evidence

    Page 1

    Fire Alarm (devices, wiring, programming) → Div. 28

    Electrical

    Plumbing

    HVAC

    Mechanical

    Concrete

    Framing

    Drywall

    Painting

    Flooring

    Roofing

    Masonry

    Scope Item

    VoltEdge Electrics

    Apex Power Systems

    BlueLine Electrical Services

    Lighting Fixtures &

    Installation

    1

    Included

    $42,000

    Source

    Included

    $39,500

    Source

    Included

    $36,000

    Source

    Emergency & Exit

    Lighting

    1

    Included

    $8,200

    Source

    Not mentioned

    Source

    Included

    $7,800

    Source

    Electrical Panels &

    Distribution

    1

    Included

    $28,000

    Source

    Included

    $25,500

    Source

    Included

    $26,200

    Source

    Fire Alarm System

    (by EC)

    1

    Excluded

    Source

    Included

    $14,000

    Source

    Hidden Exclusion

    Source

    Low Voltage Rough-In

    1

    Included

    $9,500

    Source

    Excluded

    Source

    Included

    $8,900

    Source

    Temporary Power &

    Construction Power

    1

    Included

    $6,000

    Source

    Alternate

    $4,500

    Source

    Not mentioned

    Source

    Device Installation

    (Outlets, Switches)

    1

    Included

    $18,000

    Source

    Included

    $16,800

    Source

    Included

    $17,200

    Source

    Conduit & Wiring

    1

    Included

    $52,000

    Source

    Included

    $48,000

    Source

    Included

    $49,500

    Source

    Total

    $163,700

    $143,800

    $109,600

    Every missing scope item, buried exclusion, and inconsistency surfaces automatically, linked to the original source document

Built-in tools that keep your preconstruction team aligned

Send bid invitations directly from Nivel. Subs submit in any format -- PDFs, Excel, emails, even handwritten notes. No chasing, no reformatting, no inbox chaos.

Invite Subs and Manage Bids in One Place

Send bid invitations directly from Nivel. Subs submit in any format -- PDFs, Excel, emails, even handwritten notes. No chasing, no reformatting, no inbox chaos.

Invite Subs and Manage Bids in One Place

Send bid invitations directly from Nivel. Subs submit in any format -- PDFs, Excel, emails, even handwritten notes. No chasing, no reformatting, no inbox chaos.

Invite Subs and Manage Bids in One Place

Upload your drawings and specs. Nivel pulls every scope item automatically and cross-references it against every bid -- so nothing gets assumed, skipped, or missed.

Scope Extracted Straight From Your Plans

Upload your drawings and specs. Nivel pulls every scope item automatically and cross-references it against every bid -- so nothing gets assumed, skipped, or missed.

Scope Extracted Straight From Your Plans

Upload your drawings and specs. Nivel pulls every scope item automatically and cross-references it against every bid -- so nothing gets assumed, skipped, or missed.

Scope Extracted Straight From Your Plans

Every gap, exclusion, and inconsistency Nivel flags links directly back to the original document and page. No digging, no second-guessing.

Every Answer, One Click Away

Every gap, exclusion, and inconsistency Nivel flags links directly back to the original document and page. No digging, no second-guessing.

Every Answer, One Click Away

Every gap, exclusion, and inconsistency Nivel flags links directly back to the original document and page. No digging, no second-guessing.

Every Answer, One Click Away

From Raw Bids to Apples-to-Apples in Minutes

Simple steps to smarter bid
decisions

No setup, no reformatting, no manual cross-referencing. Just upload and go.

1

Invite subs or upload bids in any format

2

Nivel extracts scope & structures every bid

3

Nivel shows every gap & exclusion flagged

4

Award with confidence, every line verified

From hundreds of hours to minutes

Nivel handles the manual work so your team focuses on the decision making and risk management.

Nivel handles the manual work so your team focuses on the decision making and risk management.

True Apples-to-Apples Comparisons

Bids structured into a consistent view across every trade -- so you're comparing scope, not formatting.

True Apples-to-Apples Comparisons

Bids structured into a consistent view across every trade -- so you're comparing scope, not formatting.

True Apples-to-Apples Comparisons

Bids structured into a consistent view across every trade -- so you're comparing scope, not formatting.

Gaps and Exclusions Surface Automatically

Every inconsistency flagged before it becomes a change order.

Gaps and Exclusions Surface Automatically

Every inconsistency flagged before it becomes a change order.

Gaps and Exclusions Surface Automatically

Every inconsistency flagged before it becomes a change order.

RFIs Managed Inside Nivel

Send clarifications to subs and track every response without leaving the platform.

RFIs Managed Inside Nivel

Send clarifications to subs and track every response without leaving the platform.

RFIs Managed Inside Nivel

Send clarifications to subs and track every response without leaving the platform.

Full Source Traceability

Every insight tied back to its original document. Verify anything in one click.

Full Source Traceability

Every insight tied back to its original document. Verify anything in one click.

Full Source Traceability

Every insight tied back to its original document. Verify anything in one click.

Ideas, insights, and updates from our team

From preconstruction workflows to practical guides -- stay in the loop with how Nivel is building smarter bid leveling and what we've learned along the way.

Frequently asked questions

How do we start a pilot?
icon

Starting a pilot is simple. We’ll set you up to use Nivel on a real project with your actual bid packages. No sandbox data, no demos-only experience. The pilot lets your team see how Nivel fits into your bid review process before moving forward.

Do we need to change how we review bids?
icon

No. Nivel is designed to work with your existing workflow. Upload bids as you receive them, review comparisons the way you already do, and export results in formats your team is used to. There’s no new process to adopt.

Can multiple estimators and reviewers work in Nivel?
icon

Yes. Estimators, preconstruction managers, and reviewers can all access the same bids, comparisons, and context. Everyone works from the same information, without passing spreadsheets back and forth.

What if bids are missing scope or formatted differently?
icon

That’s exactly what Nivel is built for. The system handles inconsistent formats, incomplete scope, and unclear inclusions or exclusions—then highlights gaps and differences so they’re easy to review.

Can I trace every comparison back to the original bid?
icon

Yes. Every comparison, callout, and scope item links back to the original bid line or plan reference. You can always see where the information came from and verify it directly.

How do we start a pilot?
icon

Starting a pilot is simple. We’ll set you up to use Nivel on a real project with your actual bid packages. No sandbox data, no demos-only experience. The pilot lets your team see how Nivel fits into your bid review process before moving forward.

Do we need to change how we review bids?
icon

No. Nivel is designed to work with your existing workflow. Upload bids as you receive them, review comparisons the way you already do, and export results in formats your team is used to. There’s no new process to adopt.

Can multiple estimators and reviewers work in Nivel?
icon

Yes. Estimators, preconstruction managers, and reviewers can all access the same bids, comparisons, and context. Everyone works from the same information, without passing spreadsheets back and forth.

What if bids are missing scope or formatted differently?
icon

That’s exactly what Nivel is built for. The system handles inconsistent formats, incomplete scope, and unclear inclusions or exclusions—then highlights gaps and differences so they’re easy to review.

Can I trace every comparison back to the original bid?
icon

Yes. Every comparison, callout, and scope item links back to the original bid line or plan reference. You can always see where the information came from and verify it directly.

How do we start a pilot?
icon

Starting a pilot is simple. We’ll set you up to use Nivel on a real project with your actual bid packages. No sandbox data, no demos-only experience. The pilot lets your team see how Nivel fits into your bid review process before moving forward.

Do we need to change how we review bids?
icon

No. Nivel is designed to work with your existing workflow. Upload bids as you receive them, review comparisons the way you already do, and export results in formats your team is used to. There’s no new process to adopt.

Can multiple estimators and reviewers work in Nivel?
icon

Yes. Estimators, preconstruction managers, and reviewers can all access the same bids, comparisons, and context. Everyone works from the same information, without passing spreadsheets back and forth.

What if bids are missing scope or formatted differently?
icon

That’s exactly what Nivel is built for. The system handles inconsistent formats, incomplete scope, and unclear inclusions or exclusions—then highlights gaps and differences so they’re easy to review.

Can I trace every comparison back to the original bid?
icon

Yes. Every comparison, callout, and scope item links back to the original bid line or plan reference. You can always see where the information came from and verify it directly.

Stop losing hours to manual bid review. Start awarding with confidence.

Nivel gives preconstruction teams the speed and accuracy to level every bid, catch every gap, and make every award call with confidence.